Archive for the ‘BOM’ Category

Enable Your CM Processes for Mission Critical Process Management

Posted by Miki Lumnitz on July 8, 2009

Next week I will join the BOM summit 2009 which will occur at Chicago, Illinois, hosted by Razorleaf. We will discuss the business process coverage from Bidding to Service. The industry-specific needs and methodologies

Razorleaf will host a multi-day event for companies interested in understanding the methodologies and capabilities behind the ENOVIA SmarTeam BOM module and Engineering Express package. Product managers from Dassault and solution architects from Razorleaf will present the software’s capabilities, demonstrate detailed methodologies, and facilitate discussions among a uniquely focused peer group. Attendees will present and share their industry-specific BOM needs, further enriching the event.

The event is a follow-up to last year’s successful BOM Summit. One attendee had this to say about BOM Summit 2008:

“I think it [the event] was invaluable, frankly. I would highly recommend that anybody come. I think that the format was extremely appropriate and had a lot of value. The information that you could focus on here without having other interruptions… I would definitely come again.”
- Maureen Murphy
Engineering Services manager at AS&E

http://www.razorleaf.com/events/bom-summit-09/

Posted in BOM, Engineering, mid-market, PLM | Tagged: , , , , , , | 1 Comment »

PLM for the Mid-market Supply Chain

Posted by Miki Lumnitz on June 2, 2009

Today, an article I wrote have been posted on the Supply & Demand Chain Executive website, in the “In Depth” section.

clip_image001

Below is the link and full text.

http://sdcexec.com/web/online/In-Depth/PLM-for-the-Mid-market-Supply-Chain/4$11358

PLM for the Mid-market Supply Chain

A better look at a behind-the-scenes catalyst

Posted: May 21st, 2009 03:58 PM EDT

By Miki Lumnitz

In today’s global economic climate, companies around the world — from large OEMs (original equipment manufacturers) to mid-market manufacturers — face enormous challenges. It is easy to write off the problems of mid-market companies as comparatively insignificant. After all, they’re smaller; doesn’t that mean their problems are smaller too?

In reality, today’s mid-market companies’ face the same challenges as large OEMs, and they face them with fewer resources, less money and less ability to absorb risk. In addition, they have to deal with the increased competition in the mid-market, the increasing demand for a shorter product lifecycle, the pressure to develop more complex products than in the past, the management of multiple parallel projects and being part of the supply chain.

The Evolving Role of the OEM

The position of mid-market companies within the supply chain has undergone dramatic changes. OEMs, which may or may not be mid-market companies themselves, require increasingly more value, efficiency and sheer output from mid-market suppliers, and tend to deal with only the highest-level core and competitive competencies internally. For instance, in some industries, approximately 65 percent of final product development is outsourced to mid-market suppliers. Given such increased demands, suppliers need to differentiate themselves competitively by bringing specific knowledge and innovation to their products and to their relationships with the OEMs — it’s a matter of survival. If OEMs don’t see the results they need as quickly as required, they’ll gladly replace one supplier with another, or possibly shrink the supply chain altogether. Add to that the unpredictability of other suppliers’ actions (which affect the entire chain), and it’s clear that PLM isn’t a luxury — it’s a necessity.

The role of the OEM is changing. Ten years ago, the OEM controlled the entire supply chain and maintained all the specifics of product development in-house. Suppliers were part of an indelible hierarchy, with efficiency viewed as happenstance, not as an overarching value. As time went by and technology advanced, OEMs saw the benefit of collaborating with tier-one suppliers who were responsible for major product components. This trend hasn’t slowed — it has progressed from involving the traditional supply chain hierarchy to networks of suppliers.

The consequence of this change is that OEMs can no longer dictate the systems and methodologies used by their suppliers, as they are connected to multiple OEMs and to other companies. In the future we will undoubtedly see more and more networks of suppliers exchanging intellectual property with multiple OEMs across industries and with each other.

PLM Adoption in the Mid-market

For the large OEMs of the world the use of product lifecycle management (PLM) is practically a standard. However, in the mid-market — the segment that contains the vast majority of the world’s manufacturers — the use of PLM is not as prevalent.

In order to succeed and thrive, high-tech/industrial mid-market suppliers have to innovate and develop new products faster (with a target time-to-market projection of three to six months for the high-tech industry) and streamline operations and communications. They need to achieve global development excellence and increase efficiency by leveraging core competencies of the value chain and ensure on-time, on-cost and good-quality product delivery. They must also integrate regulatory compliance into product lifecycle processes to reduce business risk and sell products in global markets.

Adopting PLM isn’t a chore that companies must complete; it is a way to increase innovation and stay competitive. Product lifecycle management helps streamline business and development processes, especially with regard to collaborative engineering, standardization, mechatronics (multi-disciplinary product development integrating mechanical, electrical/electronic and software components that require unified bill-of-materials management — a "single version of the truth"), change management, components engineering and IP reuse. The resulting benefits are substantial:

  • Increased product innovation: By adopting new product introduction NPI methodology within a single engineering platform, from concept to manufacturing.
  • Global product development excellence: By leveraging streamlined global innovation networks and concurrent multi-disciplinary mechatronics product development.
  • Improved profitability: By leveraging existing products/components and creating modular new products that facilitate re-use in multiple applications.
  • Shortened time-to-market and improved ROI: By lowering development, manufacturing and purchasing costs while delivering improved product performance.
  • Increased control on costs, quality and delivery dates: By integrating quality and change management processes and enabling real-time decision making for all levels.
  • Ensured customer satisfaction: By being demand-driven and integrating customer requirements and specifications throughout the engineering process.

The PLM vision is wide and can touch almost every hidden corner of a company. This is why a phased approach is recommended, otherwise known as: "start small and grow as you go." It’s like eating a sandwich: You’re better off taking small bites in an orderly succession, rather than to try to eat the entire thing in one bite and risk choking. Product lifecycle management should undo process clogs, not create them.

Based on past experience, most mid-market companies start preparing themselves for PLM deployment by managing their design environment. They do this by creating a solid PLM foundation with computer-aided design (CAD) data and product data, and then they expand their implementation to cover the process from concept to manufacturing using an "item-centric" approach (including collaboration around the bill of materials (BOM) and process/change management), based on the same modular PLM platform. After making sure these elements are in place, PLM can be integrated with other enterprise processes through global collaboration and effective decision-making processes.

The greater the scale of the deployment, the greater the benefits are and, hopefully, the greater the adoption/acceptance by end-users. Starting the deployment from concept to manufacturing will attract the most end-users to the process (who will see the value of collaboration) and will spur user acceptance. Even if for each business process you initially choose to deploy the most simple and intuitive solution, and not necessarily the most advanced one available, you’ll succeed and grow as you go within the same PLM platform. Your initial focus should be on managing the process and getting people on board. Once you’ve completely taken care of that, then go ahead and gradually bring more advanced, complex solutions into the fold.

Real-world Example

As an example, let’s review Pentair Water, a company that opted to create a collaborative PLM global environment using ENOVIA SmarTeam’s solution. The major motivating factor for Pentair’s decision to deploy PLM was the need for the company to unite its many worldwide branches — especially in China and India — and to create synergies among its largely autonomous divisions. Up to that point Pentair had been distributing product data by express shipping CDs, e-mailing massive files or uploading information to non-secure FTP servers. All three of these methods posed an extreme risk to security, data consistency and speed. Pentair decided to implement PLM to reduce business risks and lower the overhead involved in meeting product quality standards.

Ultimately, Pentair executives used the PLM solution to address four needs: a common 3D design system, a single centralized data repository with a common model, a collaborative platform capable of supporting multiple locations, and a common approach to business process management.

The results the company has seen have been positive. Having a single source of data and a consistent data model with revision and version management allows multiple Pentair designers to simultaneously collaborate on a project, cutting design cycles in half while improving quality. Because PLM allows the company to avoid redundancy in its designs, Pentair has seen fewer mistakes overall and a decrease in the number of changes made at the tooling stage — when they’re the most expensive. Product lifecycle management has also cut down on wasted time searching through databases for information that may not exist and has improved collaboration between U.S. offices and manufacturing centers in China and India. PLM has become Pentair’s main solution for supply chain management, customer service, quality, production and purchasing.

PLM and Emerging Industries

The benefits from adopting PLM are tangible across all industries, but not all companies in all industries are currently mature enough in how they view PLM to effectively adopt it. When we look at the PLM market (especially in the mid-market), analyzing it within a technology wave, it’s rather difficult to determine whether it’s in a "growth" phase or "maturity" phase. A closer look at segmentation is necessary to make that call. Companies from some of the manufacturing sector’s "traditional" industries (automotive, aerospace & defense, industrial equipment, high-tech, energy & process, shipbuilding, consumer goods) tend to be ready to adopt PLM, while other manufacturing industries (consumer packaged goods, construction, medical devices) aren’t so easy to read.

The markets that many would define as being emerging industries (including apparel, pharmaceuticals and business services) are still in their respective "growth" phases. This means that most of those companies in the mid-market will be ready to adopt PLM only after several years. This puts the pressure on the aforementioned "traditional" manufacturing companies to adopt PLM as they already face competitors that have implemented PLM and thus have an advantage over them.

Companies within the emerging industries, on the other hand, should understand that if they can successfully adopt PLM before their competition, they can jump ahead in their market, bringing more innovative products to the forefront in shorter amounts of time, using quicker development strategies and making better use and reuse of their company’s intellectual property.

Obviously, deploying PLM will require a culture change within the company. The challenges involved in implementing PLM will be minimal, provided that the selected solution delivers industry best practices and modular out-of-the-box packages; offers the flexibility and openness required to fine-tune the out-of-the-box packages in accordance with existing company process; and most importantly, ensures a low total cost of ownership. After all, streamlining your mid-market company’s product lifecycle management should not break the bank.

As final note, the current economic situation in the global market is indeed a momentous challenge, but it is also a huge opportunity. By the time it ends, some companies will have disappeared, but others will be there, armed with dedication to innovation and a willingness to evolve. Product lifecycle management can help your company see future opportunities that transcend current challenges.

Posted in BOM, Design, General, Manufacturing, mid-market, PLM | Tagged: , , , , , | 2 Comments »

PLM at high-tech/industrial mid-market companies

Posted by Miki Lumnitz on October 18, 2008

When looking at high-tech/industrial mid-market companies, in order to succeed in this market Those companies have to innovate new products faster (time to market of 3-6 months in high-tech), streamline operations and collaboration. They need to achieve global development excellence and efficiency by leveraging core competencies of the value chain to ensure on-time, on-cost and quality product delivery. Integrate regulatory compliance into product lifecycle processes to reduce business risk and sell products in global markets.

In order to achieve that, adopting PLM will streamline their processes especially across the following areas:

  • Requirements & Specifications
  • Collaborative Engineering
  • Standardization  & IP Reuse
  • Mechatronics – Multi-disciplinary product development integrating mechanical, electrical/electronic and software components
  • Business Processes & Change Management
  • Standard components Engineering
  • Linkage between product development and Project Management
  • Real-time Collaboration & IP exchange internally and across the value chain and the eco-system

The main benefits those companies will see are:

  • Increase product innovation – By adopting NPI methodology within a single engineering platform, from concept to manufacturing
  • Encourage global product development excellence – By leveraging streamlined global Innovation Networks and concurrent multi-disciplinary mechatronics product development
  • Improve profitability – By leveraging existing products/components and creating modular new products that facilitate re-use in multiple applications
  • Shorten time to market and improve return on investment – By lowering development, manufacturing and purchasing costs while delivering improved product performance
  • Increase control on costs, quality and delivery dates – By integrating quality and change management processes and enable real-time decision making for all levels
  • Ensure 100 percent customer satisfaction – By operate demand-driven and Integrate customer requirements and specifications throughout the engineering process

Posted in BOM, Engineering, Manufacturing, Methodology, mid-market, PLM | Tagged: , , , , , , , | Leave a Comment »

Item-Centric product data management

Posted by Miki Lumnitz on October 16, 2008

Lately I see more and more usage of the term ‘Item-Centric’ PDM / PLM. Is every PDM application that can support BOM (Bill of Material) also can say it is ‘Item-Centric’ ?

What do you say, ‘Item-Centric’ = BOM ?

Is it that simple ?

Item-Centric product data management – What is it really?

I will try to specify few elements that are MUST for a real Item-Centric PDM / PLM. After that you can judge yourself which application really provides Item-Centric PDM / PLM, and which just knows to have a simple BOM from the design.

 

The 1st element that is critical to understand will be the fact that when talking about Item-Centric PDM / PLM, we are talking about managing the development process from Concept to Manufacturing, and not just design to BOM. The reason I am saying that is an Item-Centric PDM / PLM means bringing a Top-Down Engineering approach which means I am starting with Item (from Concept), reusing items structures, planning top-down up to the module level and only then going to design bottom-up. any solution that starts bottom-up from the design is not Item-Centric.

Next important element will be Item Maturity Management. When working Item-Centric, the Item maturity represent the development business process maturity and unlike a design maturity (that usually will be based on Check-in/Check-out/Release/Obsolete of the design) the item maturity really represent the development maturity (e.g. In Work, Approved by Engineering, Limited Released for purchasing only (LLI support), Released to manufacturing, Delivered, In Service…). also the movement (Promote/Demote) within this maturity process need to be performed based on the company development process rules and not just sequential.

But, the most important and critical is the ability to automatically apply the company business rules needed for getting into a new maturity state, e.g.:

  • Does specifications needs to be released and frozen?
  • Do I allow InActive/Obsolete children?
  • Do I need all children to be in minimum state (e.g. Released, Approved by Engineering)
  • When I demote an Item, how can I be sure I am not breaking maturity of a parent?

Usually, this part will be where you will need to invest a lot of customization (in applications that do not support real Item-Centric).

When implementing an Item-Centric PDM / PLM you need to be able to support different configuration views (e.g. Conceptual BOM, Engineering BOM, Manufacturing BOM, Serialized BOM…) the minimum will be E-BOM (Engineering BOM) and M-BOM (Manufacturing BOM). Is this enough? when working Item-Centric I need the capability to synchronize between those different configuration views, synchronize with embedded business logic (what needs to be synched and what is not), Item-Centric means I’m managing mechatronics (Multi-disciplinary product development integrating mechanical, electrical/electronic and software components – Unified BOM including Hardware (mechanical, electrical / electronic) & Software. This means I need to be able to automatically synch the unified BOM from multiple sources concurrently (Mechanical, Electronics, Software, Standard components, Outsourcing, Excel…) = Concurrent Engineering.

Also, do not forget different configuration views needs to be frozen based on different maturity states (E-BOM needs to be frozen when ‘Approved’ by engineering, but M-BOM is still open for modifications by production engineering.

 

So, to summarized – if one is selling you an Item-Centric PDM / PLM ask him:

  1. Do you support Top-Down Engineering?
  2. Do you support Item Maturity?
  3. Can I model my development process into the Item Maturity?
  4. Does the Item Maturity support Out-Of-The-Box business rules?
  5. Do you support Configuration views (E-BOM, M-BOM)?
  6. Can I automatically synchronize between the Configuration views?
  7. Can I manage Mechatronics? unified BOM including Hardware (mechanical, electrical / electronic) & Software?
  8. Can I Freeze Configuration views based on Item Maturity?

If the answers are YES to all those questions, you’ve got a real Item-Centric PDM / PLM in hand, if NOT…

Posted in BOM, Engineering, Manufacturing, mid-market, PLM | Tagged: , , , , , , , | 4 Comments »

The new PLM paradigm – 3DLive, what is it really about?

Posted by Miki Lumnitz on July 12, 2008

As we starting to see now great enthusiasm around the world about 3DLive, I thought it will be nice to try an explain what is it really about.

3D equal Design – doesn’t it?

For years the world considered 3D as a design representation, more than that, 3D as a mechanical design only. But we know PLM is much more than just the mechanical design!

You know Dassault Systèmes is talking for years about ‘See what you mean’. Did you knew what they mean? now you should!

3DLive should not considered only as a product but as new paradigm for how we work with PLM data. Actually it is very simple, just need to look at the name:

image

Life like experience – The future of PLM

I am working within the PLM arena for more than 10 years and what can I say? PLM user interface is boring! Tree representations, tables with data, profile cards and meta data… and we have a viewer!!! so we can have some colors in the UI… :-)

Think about it: what if you could navigate on PLM data as it is in real life (Now you are probably thinking ‘what is he talking about…’). yes, like in real life! let’s look at some examples:

With 3DLive you can represent all PLM data as 3D. Life Like experience! Have On-line (Real time) access to PLM. By anyone From anywhere. It is easy to use and intuitive using Search and navigate on 3D turntables. Also, enables you Live PLM Collaboration with Chats, Redlining, Snapshots and Co-review. All product information Live and In-context. But the thing I think is the killer about 3DLive would be the Decision support capability, enables graphical dashboards using a very nice and easy to use compass.

During the Product lifecycle management 2008 summit in Israel, we have demo 3DLive using a touch screen. Here is part of the scenario presented before, this time live on a touch screen with voice explanations:

3DLive is the first concept delivering PLM 2.0 as I wrote in my previous post: PLM 2.0 – PLM Online for All

Posted in BOM, mid-market, PLM, PLM 2.0 | Tagged: , , , , , , | 1 Comment »

ENOVIA SmarTeam Engineering Express – The worldwide road show…was close to your door…

Posted by Miki Lumnitz on July 8, 2008

2008 has been an interesting start not only for customers who decided to go for ENOVIA SmarTeam Engineering Express (SNE), but also for those who are promoting it all over the world: Naeem Dalal product marketing manager in Dassault Systèmes Israel and the solution manager of SNE, and Gilad Friedman Director of ENOVIA channel Sales, Dassault Systèmes Israel. Both guys have toured the world since February 08, delivering a one-day sales-oriented training dedicated for Sales people and project managers, followed by a 2-days technical training dedicated for Pre-sales and implementers.

The sales training focuses on the knowledge around selling the Express offering for the SMB market while discussing the main PLM challenges of these customers in the past and nowadays around their BOM management (EBOM, MBOM and more). Such experience has been acquired by the VARs who attend the training and are very knowledgeable about SmarTeam implementation.

The 2 days technical training combines a general overview of the solution, and a drill down into the “Concept to Manufacturing” process, through hands on exercises, thus showing how to execute the five major phases of the process easily and quickly using the out-of-the-box offering of ENOVIA SmarTeam Engineering Express.

The road show around the globe started in Stockholm, Sweden, then continued to North America:  Toronto, Cleveland, Detroit and LA. In AP region, the tour started in Singapore, then continued to Taipei, Beijing, Tokyo and ended up in Bangalore and Pune in India.

The tour will soon continue to Latin America, end of July!

The feedbacks so far are very positive, and attendees are very keen on starting new opportunities with SNE in their regions. Many even mentioned that they are interested in adopting some parts of the solution in their existing customer’s implementations.

Here are some of their quotes:

“I love it. We have the best platform to explain to potential customers — a lot of requests from customer will be fulfilled by the functionality of the new product. We think it is very good work; I am really impressed how fast the performance is.”

“I think it is a very good package; can’t wait to see the customers…”

“I think Express will give customers a ready-to-go solution which is quite beneficial; it is really a differentiator comparing to the competition.”

Posted in BOM, Engineering, mid-market, PLM | Tagged: , , , , , | Leave a Comment »

BOM management – are you using Excel?

Posted by Miki Lumnitz on July 6, 2008

If you needed to take a guess… just a guess.. what is the most common ‘enterprise’ application that is used for managing BOMs in SMB companies?

I am wondering whether this was the first thing you have thought about (I know, you can guess it from this post title :-) )…

The most common ‘enterprise’ application that is used for managing BOMs in SMB companies is Excel

Is it the right way? why not, some of you will say… Excel is a great tool (agreed by the way…) it is easy to use, it is flexible, but is it controlled?

Let’s look at some critical data management aspects concerning BOM management:

  • Look at the following picture, How to Identify the “Right” BOM? Can you help me…

image

  • I need to change the screw, where is it used…

image

  • What about increasing data reuse? or standardization of components? or security?

image

  • And then… as always… what happened when I have a change…

 

So yes, using PLM to manage your BOMs will be less flexible as using excel and the reason for that will be that a PLM system will take care of your data consistency and your configuration control.

Because of the fact that BOM management is a major challenge in a lot of SMB companies and is very time consuming (time which most of those companies does not have…), we gave special attention to those challenges within our SNE solution (ENOVIA SmarTeam Engineering Express). I think the 3 most important benefits will be:

  • Product/BOM Maturity management (with the configurable, embedded business logic to model your company business maturity process and conditions)
  • BOM structures synchronization. to enable concurrent and controlled BOM editing (with the configurable, embedded business logic to model your company roles of moving from Design to E-BOM, from E-BOM to M-BOM, Reuse BOMs…)
  • Easy to use BOM editing and compare

 

and in the end… do not forget… COLLABORATION !!!

Posted in BOM, Engineering, Manufacturing, Methodology, mid-market, PLM | Tagged: , , , , , , , | 3 Comments »

ENOVIA SmarTeam Engineering Express (SNE) – What do people really think?

Posted by Miki Lumnitz on July 1, 2008

As part of my work you can imagine I am meeting a lot of customers, potential customers, resellers and PLM professionals all over the world. it is always nice to hear what they think about what we in ENOVIA SmarTeam delivers to the PLM market. I have already wrote to you about Technicom review of ENOVIA SmarTeam Engineering Express in my previous post ENOVIA SmarTeam Engineering Express Review by TechniCom.

This time I have the opportunity to give you the view of a PLM professional, Jonathan Scott.

Jonathan is a senior PLM consultant from Razorleaf Corp. and has vast experience in PLM, methodology wise and technically.

So, here is Jonathan’s view… this is what people really think…

Dassault Introduces Engineering Express (SNE)

Those of you keeping up with Dassault’s latest announcements related to ENOVIA SmarTeam have certainly heard of SmarTeam Express. This relatively new offering (first introduced on top of V5R16) is a fresh approach to PDM. Several players in the PDM market have tried to offer watered-down versions of their software in an effort to make it easy to adopt PDM. The trouble has generally been that either a) there is no easy way to get from the junior version of the software to the senior version without rip-and-replace, or b) the junior version is missing really critical capabilities (like an API or a database). For their part, Dassault chose to make their offering a streamlined, not crippled, version of ENOVIA SmarTeam. The difference is obvious; you can do anything with the Express offerings that you can do with good old ENOVIA SmarTeam – the Express version just takes some of the distractions out of the way up front.

Dassault’s first installment of the Express lineup was SDE, or SmarTeam Design Express. SDE is targeted at CAD designers and CAD workgroups, in organizations large and small. The offering is a collection of pre-configured ENOVIA SmarTeam elements, including a focused data model, some great customizations, well-designed Profile Cards, and optimized settings. The “streamlined” part of SDE is that users don’t have to think about (or even see) information in the system not related to CAD work. Project tasks, contacts, bills-of-material, and other advanced system capabilities are turned off, allowing users to focus on revision management and relationship management of CAD data. It’s important to note though that “turned off” implies that these other features can be turned on if and when the time comes.

That brings us to SNE. SNE is SmarTeam Engineering Express (SEE is a Dassault designation for another piece of software, so SNE was selected instead). SNE is built on the same data model as SDE, making it easy for new users of the system to add capabilities by removing or applying various Express behaviors and configuration elements. SNE targets the overall engineering process, as a superset of the CAD design process. If I was to offer a slogan for the combined SDE/SNE package, I would say that it, “manages product data from concept through manufacturing”. That includes change processes, BOMs, CAD data, and related documentation.

The Expresses each ship with a methodology guide describing the answers to not just the “how-to” questions, but also the “why” questions. With this, Dassault is providing a powerful tool, a quick-start approach, and best practices built right into the software. What’s really clever about SNE is the way that it incorporates more than just mechanical design. For instance, SNE includes a process for managing ECAD (electrical CAD) files and BOMs side-by-side with MCAD (mechanical CAD) and software design information. The complete product structure can be managed and manipulated in a revision controlled environment (let’s see ERP do that).

SNE contains an even larger set of useful automations and customizations than SDE. Best of all, the latest versions of these Expresses were designed to work together. So what started as a good idea, “provide a streamlined PDM tool with best practices built-in”, has become even stronger in the second addition to the Express line-up. SNE is available on top of V5R18 (at no additional cost, I should mention). Based on the successes and capabilities of SDE and SNE, I am optimistic about the value of the other Express offerings Dassault has in the works.

You can find the article also in Razorleaf web site: http://www.razorleaf.us/dotnetnuke/Newsletter/June2008/tabid/156/Default.aspx#922

Posted in BOM, Design, Engineering, mid-market, PLM | Tagged: , , , , , , , , , | Leave a Comment »

From Documents management to BOM management…

Posted by Miki Lumnitz on June 1, 2008

Many of the companies I know do understand and implements data management for mechanical CAD design. Many of those think it is enough. But, is it really enough? Does it represent my product structure?

Let’s see an example:

What do you see in here? This is my mechanical design.

clip_image002clip_image004

What I can see is: A palette with two screws.

Is that the definition for the product? The truth is that this product is: A movement detector to identify earthquakes.

Can you realize that from the mechanical design only? Probably not…

clip_image006clip_image008

The problem is that in the organization we have a lot of islands of information. all are related to my product structure and defining it: Mechanical design, Electrical design, Embedded software, Requirements, Specifications, Analysis, Simulations, Testing specs, Tooling… and more…

So… what should I do? How do I manage my complete product structure if managing my mechanical design only is not enough?

The answer my friend, will be… you need to manage BOM (Bill of Materials) – Items structure.

Item is this magic entity invented in order to comprise all definitions of the product and to represent its complete physical structure.

This will also enable you to follow the leaders:

  • CMII
  • EIA-649
  • MIL-STD-973A

If you are looking for an easy and robust solution for BOM management you can have a look at ENOVIA SmarTeam Engineering Express.

image

Posted in BOM, Design, Engineering, mid-market, PLM | Tagged: , , , , , , | 2 Comments »

 